Tolland High School
Tolland, Connecticut |
|
Architect: Moser Pilon Nelson
Construction Manager: FIP Construction, Inc.
Completion Date: August 2006 |
|
| |
|
 |
 |
Windows:
Product: Kawneer 8225TLXO Window
Curtain Wall:
Product: Kawneer 1600 System 1 (7-1/2" & 10-1/2")
with Kawneer GlassVent |
Curtain Wall :
Product: Kawneer 1600 System 1 (7-1/2" & 10-1/2")
Entrances:
Product: Kawneer 500 Wide Stile Door |
 |
 |
Curtain Wall:
Product: Kawneer 1600 System 1 (6") |
Entrances:
Product: Kawneer 500 Wide Stile Door
Curtain Wall :
Product: Kawneer 1600 System 1 (6") |
| |
|