Tolland High School

Tolland, Connecticut

 
Architect:  Moser Pilon Nelson
Construction Manager:  FIP Construction, Inc.
Completion Date:  August 2006
 
   

Windows:
Product: Kawneer 8225TLXO Window
Curtain Wall:
Product: Kawneer 1600 System 1 (7-1/2" & 10-1/2")

            with Kawneer GlassVent

Curtain Wall :
Product: Kawneer 1600 System 1 (7-1/2" & 10-1/2")
Entrances:
Product: Kawneer 500 Wide Stile Door

Curtain Wall:
Product: Kawneer 1600 System 1 (6")

Entrances:
Product: Kawneer 500 Wide Stile Door
Curtain Wall :
Product: Kawneer 1600 System 1 (6")